Works:
- Gas purification system for four boilers. Four systems of 100 thousand m3 each have been installed.
- Setting up a pulp reloading station, with manufacturing of equipment (Khorostkivskyi division)
- Production and installation of a 10 m3 bunker made of AISI 304 steel (Chortkivskyi division)